How long it will take for OEM processing?
2019-11-29
Shenzhen Yuan Feng Xing Ye Technology Co.,Ltd. believes the more professional our staff are, the better service Mitour Silicone Products will provide. Ask online! Compared with other products in the same category, silicone travel bottles has outstanding advantages which are mainly reflected in the following points. Yuan Fenginsists on providing customers with one-stop and complete solution from the customer's perspective.

What are the functions of various accessories in the air compressor group? Is the role of the cold filter, and the role of precision filters, what QPS? Generally, the compressed air treatment system with low requirements for moisture content (dew point) is configured as follows:Air compressor-gas tank (regulated)-gas-water separator (remove most of the large droplets)-1 micron condensed filter (remove most of the small water and oil drops)-cold cooler (remove water to dew point 3 ~ 10 °)-0.01 micron condensed filter (remove most of the droplets ).After this configuration, it can be added according to the gas requirements of the terminal: activated carbon filter for odor removal, oil removal steam; sterilization filter (0.01 micron absolute level) and so on.The compressed air treatment system with high moisture content (dew point) requirements is configured as follows:Air compressor-gas tank (regulated)-gas-water separator (remove most of the large droplets)-1 micron condensed filter (remove most of the s

I want to be a documenter. how can I classify the construction data? those are unit sub-unit projects Project establishment, land use, survey and design, bidding, start-up approval, organization and person in charge.Supervision planning, supervision control and supervision summary.1. construction preparation 2. foundation pile 3. Change Record 4. Quality Assurance, 5. concealment 6. Construction Record 7. quality inspection record.1. drawing change Record 2. Equipment, product quality inspection, installation record 3. acceptance record of concealed works 4. construction Test record 5. quality accident handling record 6. project quality acceptance record.1. construction documents for outdoor installation (water supply, rain water, sewage, heat, gas, telecom, electricity, lighting, TV, fire protection, etc.2. construction documents for outdoor building environment
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...